Communications & Power Project: Alcoa (Myara WA)

This project included the installation of:

  • 10km of 315mm and 90mm HDPE pipe
  • 10km HV Power cable
  • 22km LV Power cable
  • 12.5km of fibre optic cable

Cape excavated 2 x trenches with a 65T trencher through pre-blasted rock, installing sand bedding, the services, sand cover and protection, and backfill and compaction; and completed 4 x HDD shots through rock with a total meterage of 220m with pipe / conduit from 100mm-315mm diameter.

alcoa project

Project Details

Client. Alcoa
Location. Myara WA, Australia
Project Duration. 4 Months