Mumbida Wind Farm

Power Project: Leighton Contractors (Geraldton WA)

Located approximately 40km south-east of Geraldton, the project included trenching, cable installation, backfilling and HV termination works for the connection of 22 wind turbines.

wind farm project

Project Details

Client. Leighton Contractors
Location. Mumbida Windfarm, Connolly Road, Burma Road WA, Australia
Project Duration. 8 months