FMG Ponds

TSF & Ponds Project: Fortescue Metals Group ()

Cape was contracted to build a series of three settlement and transfer ponds across both the Cloudbreak and Christmas Creek mine sites:

  • Kangaroo Turkey Nest
  • Norkfolk Transfer Pond
  • CC2 Settlement Pond

The scope of works included:

  • Dewatering below the water table
  • Excavation, placement, compaction earthworks as per drawings
  • Supply and install 1.5mm HDPE Liner and Geotextile underlay
  • Supply and install suction piping, including supports and vortex breaker as per drawings.
  • Supply and install miscellaneous items including pond egress safety equipment, life buoys, level indicators, fencing.
  • Construction verification and handover as per SOW
fmg ponds project

Project Details

Client. Fortescue Metals Group
Location. Couldbreak gold mine
Project Duration. 8 Months