AngloGold Ashanti

Crushing & Screening Project: AngloGold Ashanti (Plumridge Lakes WA)

Cape has been engaged to provide crushing and screening services at AngloGold’s Tropicana operations, as the result of two performance-related contract extensions.

Utilising mobile crushing and screening circuits Cape is required to produce 180,000 tonnes of Blast Hole Stemming at -25mm+10mm and 934,000 tonnes of Road Base at -40mm.

anglogold ashanti project

Project Details

Client. AngloGold Ashanti
Location. Tropicana Gold Mine, Plumridge Lakes WA, Australia
Project Duration. December 2015 – Current