132kV Feeder Joel Terrace

Power Project: Western Power (Perth WA)

Cape undertook the task of installing three new feeder cables in existing conduits and extend the existing spare conduits by approximately 20 metres under the railway reserve between East Parade and Summer Street, East Perth.

joel terrace project

Project Details

Client. WESTERN POWER
Location. East Perth, Perth WA, Australia
Project Duration. 2 Months