Altura Mining TSF Pipeline & HDD

Water Project: Altura Mining (Pilgangoora WA)

Cape was engaged by Altura Mining to undertake the installation of a 10km TSF pipeline and supporting infrastructure, including pump manifolds and reverse osmosis plant pipeworks. In addition, Cape also performed horizontal directional drilling (HDD) works to install 155m of DN250 pipe under the BHP rail line. The project, located at Pilgangoora in Western Australia, is approximately 123km drive from the town of Port Hedland.

altura mining project

Project Details

Client. Altura Mining
Location. Pilgangoora
Project Duration. 3 months