Construction of Busselton West Street DN450 Pressure Main Replacement including:

  • 655m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling along verge of a swamp
  • 151m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling under Frederick Street
  • Installation of 500m temporary DN200 HDPE PN16 bypass pressure main
    2 nightshift shutdowns and tie-ins to main pump station.
  • Installation of the associated ancillary fittings.
busselton project

Project Details

Client. Water Corporation
Location. West Busselton WA, Australia
Project Duration. 4 Months