Fortescue Metals Group (FMG)

HDD Drilling Project: Fortescue Metals Group (Solomon Hub, Pilbara WA)

 

  • Delivered the first horizontal dewatering wells constructed in Australia for a major open pit mine.
  • Successfully drilled two horizontal wells to 938m and 1,200m measured depth (MD).
  • Installed oilfield-style electric submersible pumps achieving a sustained output of 250L/s.
  • Used innovative horizontal drilling to eliminate the need for in-pit vertical dewatering infrastructure.
  • Improved safety by reducing in-pit activities and enhanced mine efficiency through well placement.

 

Project Details

Client. Fortescue Metals Group (FMG)
Project Duration. May 2018 – November 2019