PTA Airport Link Traction Power Supply Project
Power Project: Western Power (Maida Vale WA) In 2018, Cape secured a contract to energise the Public Transport Authority’s new Maida Vale Substation, as part of the Forrestfield Airport Link Project. Our team is installing approximately 3.5km of three phase underground cable, communications ducts and associated pits to create a new transmission line from the existing 132kV […]
Wanneroo Road and Joondalup Drive Relocation
Power Project: Western Power (Sinagra WA) Cape has been engaged to install two 132kV circuits of underground transmission line as well as supply and construct foundations for transition poles as part of the Main Roads WA overpass bridge construction at the intersection of Joondalup Drive and Wanneroo Road.
Pilgangoora Lithium-Tantalum Project
Water Project: Pilbara Minerals (Marble Bar WA) In 2018, Cape undertook water infrastructure works for Pilbara Minerals at its Pilgangoora Lithium-Tantalum Project. Our team continues to provide assistance with the removal, installation and adhoc management of its dewatering bore infrastructure. The original scope of work included the provision of pipelines, earthworks, telemetry control system, submersible bore […]
Newmont Boddington Drainage Trenching
Water Project: Newmont (Bannister WA) Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including: Embankment toe drain constructed along the toe of the existing embankment Buttress toe drain constructed along the downstream toe of the constructed buttress Perimeter drain constructed outside of the […]
Floreat Underground Power Program
Power Project: Western Power (Floreat WA) In 2018, Cape was awarded two packages of work, as part of the Town of Cambridge’s $40 million underground power program – Floreat East and Floreat West, encompassing 1781 homes, 57km of horizontal directional drilling, removal of 965 power poles and the installation of 597 street lights. Cape has been supporting Western […]
FMG Culverts (Pilbara)
Water Project: Fortescue Metals Group (Nullagine WA) Through our Aboriginal KCU joint venture, Cape installed culverts for FMG at its Cloudbreak and Christmas Creek mine sites in the Pilbara. The scope of works included: • Survey, level and alignment of culverts at each location • Road diversions to accommodate two-way traffic • Load, transport and unload […]
Arsenic Storage Dam
TSF & Ponds Project: BHP Billiton (Feysville WA) A volume of 80,000m3 of material was loaded, hauled, placed and compacted to construct four perimeter walls 10m high. Material was excavated from a shallow borrow pit within the facility. Wet weather conditions during construction meant that constant control was required to ensure moisture and compaction levels were […]
Rio Tinto Primary Crushing Facility
Crushing & Screening Project: Rio Tinto (Mount Sheila WA) The scope of work for this contract included primary crusher design, fabrication, installation, operation and ROM Management. Cape was required to design, fabricate, transport, and assemble a turnkey primary crushing facility for the contract. The facility was installed in two stages feeding directly into the client […]
Mt Gibson Iron
Crushing & Screening Project: Mt Gibson Iron (Koolan Island WA) In excess of 7.5 million tonnes of material was produced during this crushing and screening contract. Output level and specifications were determined by the client with a large amount of DSO produced. The contract required 24/7 operations and production of DSO -6.3mm fines peaked at […]
BHP Nickel West ROM Management & Primary Crusher
Crushing & Screening Project: BHP Billiton (Kambalda East WA) For seven years, Cape provided ROM Pad Management and Primary Crushing services at BHP Nickel West’s Kambalda operations. The contract required Cape to manage and operate a complex ROM, receiving ore from a number of third party sources. After primary crushing, the ore was fed to […]
Busselton Pressure Main & Gravity Sewer
Water Project: Water Corporation (Yalyalup WA) Package 2A: This package comprised of approximately 8172m of PN16 DN300 O-PVC pressure main and 405m of DN400 SDR11 HDPE pressure main. It included the construction of approximately 555m of PN12 DN250 U-PVC pressure main from the existing Blum Boulevard pressure main connection point on Hawker Approach to a […]
Busselton West Pressure Main
Water Project: Water Corporation (West Busselton WA) Construction of Busselton West Street DN450 Pressure Main Replacement including: 655m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling along verge of a swamp 151m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling under Frederick Street Installation of 500m temporary DN200 HDPE […]