Carnarvon Bore Main Replacement

12 February 2019

Water Project: Water Corporation (Carnarvon WA) Stage 1 Construction, installation, testing and commissioning of 10.5km of DN630 PN12.5 HDPE to replace the existing DN600 Asbestos Cement (AC) bore water collector main. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, stock watering points, bore connection fittings and ancillaries. […]

Read More

Narembeen TWS Upgrade

12 February 2019

Water Project: Water Corporation (Narembeen WA) Manufacture, supply, construction, installation, testing and pre-commissioning of civil, structural, mechanical, process, electrical, instrumentation & control (I & C) infrastructure assets for the MS Extension Narembeen TWS Upgrade. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, and associated ancillaries. Supply and […]

Read More

Yule Collector Main

12 February 2019

Water Project: Water Corporation (Port Hedland WA) Construction of DN630 Yule Bore Collector Main 6.2km of DN630 PN12.5 HDPE pipe including clearing, stringing from stockpile, welding, trenching, backfill, valves and pressure testing 6.2km of access track construction including demolition of six existing culverts along the 6km collector main access track and construction of six new […]

Read More

Peelhurst Pressure Mains & Pump Station

12 February 2019

Water Project: Water Corporation (Rockingham WA) Supply, construction, installation, testing and commissioning of 5,780m of new DN375GRP and DN400 PE100 PN20 distribution main, fittings, pits and access chambers. Supply, construction, and installation of all precast and in cast situ concrete structures, along Warnbro Sound Ave. The project also involved the upgrading of 3 Pump Stations: […]

Read More

Construction of Gravity Sewer and Pressure Main at Peel Terrace

12 February 2019

Water Project: Water Corporation (Busselton WA) Supply and Install approximately 563m of DN250 PE100 pressure main on Cammilleri Street and Peel Terrace by Horizontal Directional Drilling; supply and install 100m of 375 PVC Gravity Sewer by open trench incl. but not limited to the supply and installation of plastic lined access chamber and preparation for […]

Read More

Borefield Pipeline Installation Mt Keith Nickel Operation

12 February 2019

Water Project: BHP Billiton (Wiluna WA) This was a 35km pipeline installation as part of a major upgrade to site processing facility. To comply with environmental conditions, the pipeline had to be buried the whole 35km with a trenching machine being utilised for this. The poly pipe was welded in compliance to the conditions set out […]

Read More

Alkimos Distribution Main

12 February 2019

Water Project: Water Corporation (Alkimos WA) Stage 1 – 1735m DN800 and 1106m DN700 Mild Steel Cement Lined (MSCL) Water Distribution Main along Marmion Ave between Santorini Blvd and Shorehaven Blvd. Construction of 2 off take branches including 49m of DN500 MSCL and 4m of DN400 MSCL. Connections and tie-ins including: • To the existing […]

Read More

Leinster TSF

12 February 2019

TSF & Ponds Project: BHP Billiton (Leinster WA) 1,581,500 BCM of materials were loaded, hauled, placed and compacted raise the outer TSF walls and Decant Structure by 2.5m over 5 separate lifts. Additional scope included relocation the Tailings feed and return water pipelines.

Read More

TSF 4 Raise

12 February 2019

TSF & Ponds Project: Goldfields (Widgiemooltha WA) 163,000 BCM of materials were loaded, hauled, placed and compacted utilising Doosan 48t Excavators, JCB 36t Excavator, Caterpillar D6 Swampy track Dozer, 18t Pad Foot Roller, Cat 740 Ejector Trucks, Volvo Articulated Water Truck and Komatsu GD655 Grader to raise the outer TSF walls and Decant Structure by […]

Read More

Mt Keith TSF

12 February 2019

TSF & Ponds Project: BHP Billiton (Wiluna WA) Since 2005, Cape has worked constantly on the Central discharge facility at Mt Keith which has an internal wall perimeter of 15km.  These works involve 3 x long-reach excavators ranging from 30T-50T, 20T LGP excavator, LGP Dozers, padfoot rollers and when required Cat 740 ejector trucks. To date […]

Read More

FMG Ponds

12 February 2019

TSF & Ponds Project: Fortescue Metals Group (Mulga Downs WA) Cape was contracted to build a series of three settlement and transfer ponds across both the Cloudbreak and Christmas Creek mine sites: Kangaroo Turkey Nest Norkfolk Transfer Pond CC2 Settlement Pond The scope of works included: Dewatering below the water table Excavation, placement, compaction earthworks as […]

Read More

Tailings Storage Facility Construction TSF4

12 February 2019

TSF & Ponds Project: Goldfields 163,000 BCM of materials were loaded, hauled, placed and compacted utilising Doosan 48t Excavators, JCB 36t Excavator, Caterpillar D6 Swampy track Dozer, 18t Pad Foot Roller, Cat 740 Ejector Trucks, Volvo Articulated Water Truck and Komatsu GD655 Grader to raise the outer TSF walls and Decant Structure by 2.5m. Cape […]

Read More