Port Hedland Inner Harbour Project

Power Project: BHP Billiton & Calibre (Port Hedland WA)

Located in the Pilbara region, Cape was engaged to supply, install and commission high voltage and low voltage power infrastructure to BHP Billiton assets in and around Port Hedland and Finucane Island.
The scope included:

  • 100km of LV cable
  • 40km of HV cable
  • 7 x switchgears
  • 4 x transformers
  • 4 x generators
  • 16 x 6m light poles
  • 10 x 10m light poles
  • 12 x 20m light poles
  • 640 light bollards
harbour project

Project Details

Client. BHP / Calibre
Location. Port Hedland WA, Australia
Project Duration. 16 Months